Project Scope

The site was carefully prepared and excavated to achieve the required design levels, followed by the installation of underground services and drainage. A strong and stable subgrade and pavement structure were constructed to support daily traffic demands, before the asphalt surface was laid and finished. The project was completed with line marking and signage, delivering a safe, functional, and well-presented car park ready for use.

Aerial shots of the Woden Bus Depot Carpark at all various stages of construction, from conception to completion.

Thoughtfully engineered and expertly built, this car park combines durability, functionality, and clean design for everyday reliability.

We're Down

Got a project in mind? Let’s move.

Touch base