Project Scope

The landscaping package works were delivered between February 2024 and November 2024, forming part of the new building works at St Mary MacKillop College. Works commenced with bulk excavation at the southern end of the new development, located between the original school buildings and the newly constructed facilities.

The landscaping scope encompassed all external works, including in-situ concreting, steel edging, irrigation systems, planting, permeable paving, turf grass areas, and mulching. All works were constructed in accordance with the architect’s design intent, ensuring seamless integration with the college’s existing landscape character.